Installation Guide

Prepare your site before signage production starts.

A good installation starts before fabrication. Use this checklist to avoid delays, wrong sizing and last-minute site surprises.

Prepare Brief
1

Send site photos

Share front view, close wall view, mounting area and nearby wiring points if available.

2

Confirm measurements

Approximate width, height and mounting height help estimate size and installation method.

3

Check wall and access

Wall type, shutter position, facade condition, ladder or lift access can affect installation.

4

Plan power and timing

Illuminated signs need safe power planning and installation timing that avoids business disruption.

5

Approve final artwork

Confirm spelling, logo, color, dimensions and material before production begins.

Send These Details

Information that helps Giocondo install correctly.

Location photoWall sizeLogo filePreferred sign typePower availabilityInstallation cityDeadlineShop opening timing